Showing posts with label Brandon Florida. Show all posts
Showing posts with label Brandon Florida. Show all posts

Friday, December 9, 2022

HART Seeks Input on Proposed March 2023 Service Changes!


HART is proposing service changes throughout the network in March 2023 and is gathering feedback on the plan. HART is proposing the changes to align demand and improve efficiency while operating within our current funding framework.

HART is holding feedback sessions in person at the Marion Transit Center and onboard impacted routes. 

Unable to attend the in-person sessions? The HART Planning team takes you through a virtual walkthrough of the plan.

Click here to view the proposal and outreach opportunities, take a short survey, and submit feedback.

Monday, September 18, 2017

Plan Your Mission MAX Trip In Google Maps!

Pick a date after Oct. 8th for Mission MAX data to show!
  Still confused about what your trip will look like when Mission MAX takes effect on Sunday, October 8th? You can now plan a future trip to see any upcoming changes to your commute!

Here's a quick rundown on how to do this via Google Maps:

Step 1: Enter your origin and final destination as you currently do.

Step 2: Instead of "Leave now," select "Depart at" from the drop down menu.

Step 3: Next, enter a date beyond October 8, 2017.

You will now see an updated map and trip options reflective of Mission MAX.

Top: Current HART commute; Bottom: Mission MAX commute





The image to the right is a comparison showing how commuting options may differ between the current network and Mission MAX.

You can see in this instance, Mission MAX shaves upwards of 14 minutes off trips for those interested in commuting from Westshore to Ybor City.

Simply enter your trip, change the date beyond October 8th, and you are all set!

Hopefully, this helps to clear up any confusion you still might have about what your commute looks like in October. 

For more information on Mission MAX, visit www.goHART.org/MissionMAX!

Thursday, June 29, 2017

HART FY2018 System Redesign: Brandon Area

HART has over 25 meetings planned throughout the County!
Have you seen HART staff out at transit centers with maps and surveys, etc.? Wondering what's going on?

You're in the right place.

HART is undergoing a major system redesign, in which EVERY route will be affected in some way.

With such an undertaking, we felt it might be easier to break down the changes locally within Hillsborough County.

Let's start with Brandon.

A little background. HART is currently conducting a Comprehensive Operations Analysis (COA) of service. The COA analyzes the system, providing recommended short-term and long-term modifications for efficiencies. In the HART picture, the COA essentially "resets" service, providing a foundation for our FY2018-2027 long-term plan.

HART last conducted a COA in 2003. As you can imagine, a lot has changed since then in Hillsborough County, including employment centers, and commuting patterns.

With that in mind, Brandon generally sees improved service from the system redesign come October 2017.

Map of Proposed FY2018 System Redesign for Brandon Area

Summary of Changes:

  • Service Additions:
    • Route 60LX: Proposed all-day service would provide hourly service between Brandon Mall, Downtown Tampa. Tampa International Airport, and Northwest Transfer Center.
    • Route 360LX: Proposed all-day service would provide hourly connections between Westfield Brandon Mall, Downtown Tampa, Britton Plaza and MacDill Air Force Base. Combined with 60LX service, 30 minute LX service would exist from Westfield Brandon to Downtown Tampa.
  • Route 8: No changes on Route 8.
  • Route 31: No changes on Route 31.
  • Route 37: Route would operate between Netp@rk Transfer Center and Westfield Brandon Mall. Brandon Regional Hospital service would be provided by Route 46 and HART HyperLINK.
  • Route 46: Palmetto Beach and Causeway Blvd segments would be removed, and the route would now serve Brandon Regional Hospital. Hourly Sunday service would be added.
    • All-day, 30-minute service would be provided by a combination of routes 60LX and 360LX between Westfield Brandon Mall and Downtown Tampa.
  • Route 22X: Route would be replaced by Route 46. Routes 8, 25LX, 60LX and 360LX would provide service from Westfield Brandon Mall, to Downtown Tampa.
  • Route(s) 24LX, 25LX: Would operate with similar schedule, with added stops in Downtown Tampa.
  • Route 27LX: Downtown Service: Route 27LX would be replaced with service available on 8, 24LX, 25LX, 60LX, and 360LX.
  • HARTFlex Brandon: Service would be replaced by HART HyperLINK

Overall, the Brandon area will see the addition of crucial all-day connections to Downtown Tampa, Tampa International Airport, and Northwest Transfer Center.

We have tried our best to minimize any coverage loss and to provide alternatives for eliminated service. Should you find yourself in such a situation, a vanpool may make a great option. Visit TBARTA's website for more information.

Please also note, these are proposed changes, that must be approved by the HART Board. A Public Hearing will be held at the HART Administrative Office (1201. E. 7th Ave., Tampa, FL, 33605) on July 26th, from 5:30 p.m. - 7:30 p.m. Public comment will be available at that time.

In the meantime, visit goHART.org/TDP to see upcoming meetings, take a survey, share comments and learn more about the HART service redesign process!

Wednesday, June 14, 2017

HART taking System Redesign to the Community



HART is now in the midst of redesigning its transit system in time for FY2018 in October.

Recognizing that a one-size-fits-all approach to transit does not meet every community's needs, HART began working with Hillsborough County residents last year to identify transportation options that are more cost effective and better meet their needs.

Employment centers and commuting patterns have changed quite a bit since the last time a Comprehensive Operations Analysis of HART service was done in 2003. This service redesign takes that into account with new proposed connections, such as Brandon and the University area to WestShore and Tampa International Airport.

In the first phase, we collected community feedback on travel preferences and with this next phase, we are taking the result of those conversations (a redesigned network) to the public.

In the short-term, the service redesign will provide better travel times and more direct service to roughly 80% of current riders.

Long-term, HART is preparing for the future. The proposed network hits the "reset button" on HART service, providing a solid foundation for the future expansion of the HART network, as laid out in our 10-year Transit Development Plan. The proposed redesign provides the right mix of services and connections to get people where they need to go as our communities grow.

Plenty of opportunities to comment on the proposed redesign!

HART is Seeking Input 


HART will be hosting a series of public meetings beginning June 14 for residents and riders to give feedback on the proposed network redesign. HART staff will be on hand to gather feedback and answer any questions. A public hearing will be held on July 26.

Following extensive community outreach throughout June and July, HART staff will present the plan to the HART Board of Directors at the August meeting.

Your ideas are encouraged at any of the following public meeting opportunities.

In addition, you can visit www.goHART.org/TDP for more information on this important plan, including an interactive map of the proposed network redesign.